Definition(s)


Storm Configuration (Riser Hang-Off)

The riser is hung off (disconnected) near the wellhead in a severe storm with the LMRP in the riser string.

Source: ISO 13624-1:2009, Petroleum and natural gas industries – Drilling and production equipment – Part 1:Design and operation of marine drilling riser equipment. Global Standards

Comments are closed.