Skip to main content
Oil and Gas Drilling Glossary - IADCLexicon.org
  • About
  • Glossary
  • Topics
    • Global Standards
    • IADC Guidelines
    • Legislation
    • National or Regional Standards
    • Regulations
    • Regulatory Guidance
    • Well Control Institute
  • FAQ
  • Contribute
  •  Drilling News
  • Sources

Choke-And-Kill Line

Oil & Gas Drilling Glossary - IADCLexicon.org

Live Search

Glossary

Browse the IADC Lexicon alphabetically or by category. Get comprehensive definitions of drilling industry terms.

Continue

FAQ

Need help using the IADC Lexicon? The FAQ section will answer most of your questions, and you can also submit questions directly.

Continue

Contribute

Become a Lexicon Contributor. Simply fill out the form, then submit new terms for approval and/or edit existing terms.

Continue
  1. Posts
  2. C
  3. Choke-And-Kill Line

Definition(s)


Choke-And-Kill Line

Flexible pipe jumper located between choke manifold and blow-out preventer.

Source: API SPEC 17J, Specification for Unbonded Flexible Pipe, Third Edition, July 2008. Global Standards

C, Global StandardsArafat Hoque

Related Articles

  • Temperature, Autoignition (AIT)
  • Seal, Explosionproof Conduit
  • Seal, Explosionproof Cable
  • Protection, Type of
  • Protection, Special
  • Pressurization, Type Z
Comments are closed.

Lexicon Categories

  • Legislation
  • Regulations
  • Regulatory Guidance
  • Global Standards
  • IADC Guidelines
  • Well Control Institute

Categories

A-Z Index

  • 0-9
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z

Copyright Info

The IADC Lexicon is © IADC. However, the documents from which the definitions were drawn may be copyrighted by the original sources, and may not be used without express permission of the copyright holders. IADC expressly recognizes the copyrights of contributors to this Lexicon, including API, OGP, ISO, NORSOK and DNV.

Navigation

  • About
  • Glossary
  • FAQ
  • Contribute
  • Drilling News
  • Sources
  • Contact


Learn About Drilling

  • DrillingMatters.org
  • DrillingContractor.org
  • Drilling Contractor Digital Reader
  • IADC.org

Popular Terms

  • Normal Cubic Metres Per Hour (Nm3/h)
  • Exchangeable Sodium Percentage (ESP)
  • Standard Cubic Feet Per Hour (SCFH)
  • “B” Class Divisions (fire divisions)
  • Inside Blowout Preventer (IBOP)
  • Manifold
  • Wear Bushing
  • “A” Class Divisions (fire divisions)
  • Well Control Equipment
  • Mud Cap Drilling
  • Plug Back Total Depth
  • LMRP
  • Starting Current Ratio (IA/IN)
  • Dangerous Occurrence
  • Inflow Test
  • LOPC
  • Statement of Compliance
  • Kelly Cock
  • Restricted Work Day Case
  • Safety-Critical Elements

Recent Terms

  • Temperature, Autoignition (AIT)
  • Seal, Explosionproof Conduit
  • Seal, Explosionproof Cable
  • Protection, Type of
  • Protection, Special
  • Pressurization, Type Z
  • Pressurization, Type Y
  • Pressurization, Type X
  • Maintenance, Operational
  • Maintenance,Corrective
  • Line of Demarcation
  • Flameproof
  • Facility, Manned
  • Enclosure, Purged and Pressurized
  • Enclosure, NEMA Type
  • Enclosure, Explosionproof
  • Device, Sealed
  • Device, High-Temperature
  • Device, Hermetically Sealed
  • Device, Arcing
Oil and Gas Drilling Glossary – IADCLexicon.org is © 2023 IADC. However, the documents from which the definitions were drawn may be copyrighted by the original sources, and may not be used without express permission of the copyright holders. IADC expressly recognizes the copyrights of contributors to this Lexicon, including API, OGP, ISO, NORSOK and DNV. Click to View Disclaimer