Definition(s)


Completion

“Completion” refers to after all welding, post-weld heat treat and machining.

Source: API SPEC 6A, Specification for Wellhead and Christmas Tree Equipment, Twentieth Edition, October 2010 (Addendum November 2012). Global Standards

Completion

COMPLETION. An oil well shall be considered completed when the first new oil is produced through wellhead equipment into lease tanks from the ultimate producing interval after the production string has been run. A gas well shall be considered completed when the well is capable of producing gas through wellhead equipment from the ultimate producing zone after the production string has been run. A dry hole shall be considered completed when all provisions of plugging are complied with as set out in these rules. Any well not previously defined as an oil or gas well, shall be considered completed ninety (90) days after reaching total depth. If approved by the Director, a well that requires extensive testing shall be considered completed when the drilling rig is released or six months after reaching total depth, whichever is later.

Source: Oil and Gas Conservation Commission, Practice and Procedure, Code of Colorado Regulations, 2 CCR 404-1, February 2013. Regulations

 

Completion

“Completion” means an oil well shall be considered completed when the first oil is produced through wellhead equipment into tanks from the ultimate producing interval after casing has been run. A gas well shall be considered complete when the well is capable of producing gas through wellhead equipment from the ultimate producing zone after casing has been run. A dry hole shall be considered complete when all provisions of plugging are complied with as set out in this chapter.

Source: Oil and gas Conservation, North Dakota Administrative Code, Chapter 43-02-03, April 2012. Regulations

 

 

 

 