Definition(s)
PR
Performance requirement level.
Source: API Specification 16A, Specification for Drill-through Equipment, Fourth Edition, April 2017. Global Standards
PR
Designation determined by the extent of testing successfully performed in accordance with minimum performance criteria identified by this specification.
Source: API Specification 16A, Specification for Drill-through Equipment, Fourth Edition, April 2017. Global Standards
PR
Performance requirement.
Source: API SPEC 6A, Specification for Wellhead and Christmas Tree Equipment, Twentieth Edition, October 2010 (Addendum November 2012). Global Standards
PR
Public relations.
Source: Deepwater Well Control Guidelines. IADC Guidelines
pr
100 kPa (0.010197 kgf/mm2, 14.5 lbf/in2)
Source: ABS Guidance Notes on Geotechnical Performance of Spudcan Foundations, January 2017. Global Standards